SAP CO Product Costing"STEEL Manufacturing Process"-S/4 HANA




SAP CO Product Costing"STEEL Manufacturing Process"-S/4 HANA

"SAP CO: "Product Costing: can be implemented in Steel manufacturing"


1).This course is very useful to SAP Consultants who want to implement in Steel industry sectors in the green field implementation SAP Project whether in S4 HANA and or ECC

2).This course is designed in a very structural and details step by step way like practical Live scenarios.

3). Steel manufacturing process includes Make To Stock scenario , Make To Order scenario , By & CO products , Mixed Costing process and special procurements (Stock transfer and with drawn from different plants).


                                                                     Process

In Steel , Manufacturing process first we need prepare Iron Making and then Steel and then go for Finishing.

  • Iron making/Hot Metal:

==>Principal Input Materials : Iron Ore, Lime Stone and Coke.

==>Process : Blast Furnace

Iron is manufactured in a blast furnace. First, iron ore is mixed with coke and heated to form an iron-rich clinker called ‘sinter’. Sintering is an important part of the overall process as it reduces waste and provides an efficient raw material for Iron making.

Coke is produced from carefully selected grades of coal. Different grades of coal are stocked separately and blended before transfer to coke ovens.

  • Primary  Steel Making:

==>Principal Input Materials : Iron/Hot Metal with Scrap Steel

==>Process : Two ways It can be done Basic oxygen furnace and Electric Arc furnace.

Here, Some customers typically required Mixed Costing Process and some one not.

Basic Oxygen Furnace

Hot metal from the blast furnace and steel scrap are the principal materials used in Basic Oxygen Steelmaking (BOS).

Electric Arc Furnace

The Electric Arc Furnace (EAF) uses DRI and scrap metal.

Mixed Costing process with Basic Oxygen Furnace (BOF) + Electric Arc Furnace (EAF) methods

  • Secondary Steel Making:

  • SLABS , BILLETS and BLOOMS forming


                                      "Typical Costing month end closing Part"


  • F-02 : All FI expenses booking to common cost center

  • KB31N : SKF-data booked to Production cost centers

  • KSU1 : Assessment Cycle Creation and Assessment cost element also creation

  • CPTD : Actual Template Allocation for Other Overhead Expenses

  • KSU5 : Assessment cycle Run for allocating expenses to Production cost centers

  • KSS2 : Cost Splitting to activities wise

  • KSII : Actual activity rate Calculation

  • CON2 : Revaluation orders

  • CO8B : Co Product settlement

  • KKS1 : Variance calculation

  • CO88 : Order Settlement

Steel mfg process includes MTS, MTO, By & CO products ,Mixed Costing, Multi Special Procurements(STO & Withdrawal)

Url: View Details

What you will learn
  • SAP "Product Costing" can be implemented in "Steel Manufacturing" in S/4 HANA 1909.

Rating: 4.33333

Level: Expert Level

Duration: 17.5 hours

Instructor: Karanam Sreedhar


Courses By:   0-9  A  B  C  D  E  F  G  H  I  J  K  L  M  N  O  P  Q  R  S  T  U  V  W  X  Y  Z 

About US

The display of third-party trademarks and trade names on this site does not necessarily indicate any affiliation or endorsement of coursescompany.com.


© 2021 coursescompany.com. All rights reserved.
View Sitemap