Quantity Surveying, Estimation, Cost Control & CMS Software




Quantity Surveying, Estimation, Cost Control & CMS Software

It is a great chance to Save your time, money & effort. It is a great chance to improve your professional skills.

Welcome to Construction Quantity Surveying, Estimation & Cost Control online training course. It is focused on the practical application of Quantity Surveying, Estimation, Scheduling & Budgeting, Feasibility studying, and Cost Control using Auto Cad or PlanSwift & C.M.S Software “Construction Management System” -a 60 days License of CMS software is included within the course for FREE.


C.M.S is an amazing & easy tool & technic for construction projects to implement accurate & rapid processes of Quantities surveying, Cost Estimation, Scheduling & Budgeting, Feasibility, and Cost Control, and to provide the following output automatically by inserting minimum inputs:

* Accurate & rabid Quantity Surveying methods for all Construction Elements (Structure, Finishing, MEP, ..).

* Create the Construction Activities with detailed breakdown -automatically-.

* Create detailed Materials Take-off (Concrete, detailed Rebar, Shutters, Masonry, Plastering, Tiling, Sand, Cement, Mortar, Finishing,..) automatically.

* Create Activities Cost breakdown & cost estimation including direct cost (Labor, Materials & Equipment) & indirect cost using the Bottom-Up method – automatically-.

* Rate Analysis for different civil Works; Excavation, P.C.C, R.C.C, Masonry, Tiles, Plaster, etc..

* Obtain Manpower productivity for all civil works – automatically-.

* Create Projects budgeting including overhead, profit & Markup in easy steps.

* Create Priced Bill of Quantity as per CSI, POMI & CESMM Standards – automatically-.

* Create a control time schedule in easy steps.

* Create Manpower Cost & Histogram – automatically-.

* Create Outgoing & Income Cash flow – automatically-.

* Improve the cash flow to avoid the negative net cash flow.

* Create Resources (Manpower & Materials) S-curve through the project period.

* Create feasibility study & investment evaluation for the construction projects in easy steps.

* Making project management & Cost Control during execution in easy steps.

* Make Cost Coding & Actual cost recording.

* Make Resources (Labor & Materials) Control during execution in easy steps.

* Make Performances evaluation using Earned value management in easy steps.

* Forecast the project completion Cost (EAC, ETC) –automatically-.

* Create Progress Reports & Dashboards –automatically-.

You can easily Get the permanent CMS Platinum Software from the link included in the course Resources.


This course is a field-oriented course and contains real examples and a full real project for better understanding & simulation.

After completion of this course, you will be able to Estimate, Evaluate & Control  the cost of any Building Construction Project (From Start to Completion).

For C.M.S “Construction Management System” Software; a one year Original License of the software is included within the course for FREE.


Major topics that we will learn & achieve in this course:

Quantities Surveying & Activities Breakdown for:

all the construction as per the Standard divisions & CSI master format, & Creating a detailed Bill of Quantities BOQ showing the following:

Division 01 — General Requirement
Division 02 — Site Construction
Division 03 — Concrete
Division 04 — Masonry
Division 05 — Metals
Division 06 — Wood and Plastics
Division 07 — Thermal and Moisture Protection
Division 08 — Doors and Windows
Division 09 — Finishes
Division 10 — Specialties
Division 11 — Equipment
Division 12 — Furnishings
Division 13 — Special Construction
Division 14 — Conveying Systems
Division 15 — Mechanical/Plumbing
Division 16 — Electrical
Division 17 — Others

Detailed Materials Take-off:

Earthworks, Excavation, Backfill, & Disposal
Concrete
Rebar in diameters
Shutters
Bricks & mortars
Plaster mortars
Cement
Aggregates
Tiles, Walls & Floors
Ceiling, Paints
Water
External Finishing

Sub-contracts Activities
Activities breakdown

And Creating detailed BOQ


Cost Estimation & implementation of the followings:

Cost Estimation Knowledge & Real project Practice according to AACE & PMBOK. & eventually, you will be able to find the following & create a huge amount of outputs & reports:

    • Cost Estimation Classifications

    • Cost Estimation Methods.

    • Cost Types.

    • Activities cost Breakdown

    • Direct cost

    • Indirect cost

    • Manpower cost

    • Activities total price

    • Work package cost estimation

    • Sub-contracts & Control Account cost

    • Projects reserves

    • Overhead & profit & Mark-ups.

    • Project baseline & Budget

    • Bids types

    • Final project Price

* Obtain Priced Bill of Quantities BOQ with the standard divisions.


Scheduling & Budgeting

Learning the Cost Estimation Knowledge & Real project Practice. You will be able to find the following & create a huge amount of outputs & reports:

  • Activities Productivities

  • Activities sequences & Relations Types

  • Develop Control Schedule

  • Resources & Manpower Histogram

  • Cost Baseline & Cash flow

  • Resources (Manpower & Materials) baselines

  • Planned monthly progress for each activity

  • The Monthly payments & the Net Cash flow

  • Project Budgeting


Feasibility Study

Learning projects Feasibility Evaluation Knowledge & Real Practice. You will be able to find the following & create a huge amount of outputs & reports:

  • Construction Development Expenses

  • Marketing & Selling Plan

  • Income & Out Cash flow

  • Net Cash flow

  • Project Financial Evaluation

  • Profit improvement

  • optimum Land price & sharing percentage.


Cost Control

Learning the Quantity Surveying Knowledge & Real Practice. You will be able to find the following & create a huge amount of outputs & reports:

  • Cost Coding & Actual Cost recording System

  • Earned Value Management EVM

  • Cost Performance Monitoring

  • Schedule Performance Monitoring

  • Resources Performance Control

  • Cost Forecasting

  • All Monthly Reports

  • Dashboards

Practical application of Quantity surveying, Estimation, Scheduling, Feasibility study & Cost Control + amazing Software

Url: View Details

What you will learn
  • Quantity Surveying & Cost Estimation in accurate & rabid method for all construction elements.
  • Create detailed Breakdown for the Construction Activities automatically.
  • Create detailed Materials Take-off automatically (Concrete, detailed Rebar, Shutters, Masonry, Plastering, Tiling, Sand, Cement, Mortar, Finishing,..)

Rating: 4.05

Level: All Levels

Duration: 9 hours

Instructor: Ismail ElSaid


Courses By:   0-9  A  B  C  D  E  F  G  H  I  J  K  L  M  N  O  P  Q  R  S  T  U  V  W  X  Y  Z 

About US

The display of third-party trademarks and trade names on this site does not necessarily indicate any affiliation or endorsement of coursescompany.com.


© 2021 coursescompany.com. All rights reserved.
View Sitemap